Wayway Trail Maint with MEVO: Sunday 6/11/2023 @ 9:30am

onetracker

JORBA: President
JORBA.ORG
New Trail Build with MEVO: Sunday 6/11/2023 @ 9:30am. Come on out and help us fill in chuck holes and sure up the rock gardens on the new trail. Bring snacks, water and sturdy shoes. Tools will be provided. Ride or hike to worksite. Distance from parking spot = approx 0.75 miles. Meet down in the hollow at the gate at the end of the paved section on Cherry Ridge Road near Cabin "trail"/woods road. Heavy rain will cancel. Check WeatherBug.com or the App; if chance of Rain is 50% or greater, we will reschedule. RSVP so we can plan for tools and bagels. We will have some Snacks/Drinks/SWAG supplied by Trek Bikes in Paramus.
 
Trail is great. Was on it this past Saturday for probably the dozenth time and had unfortunate pleasure of running into dirt bikes on it. Just FYI.
 
Yep, saw some evidence of that but to their credit, they did seem to be riding lightly. Compared to quad riders who widen everything to five feet and then show of their “skillz” by sliding every turn, Motos are the lesser of two evils.
 
Trail is great. Was on it this past Saturday for probably the dozenth time and had unfortunate pleasure of running into dirt bikes on it. Just FYI.
I rode it on Monday and saw some light tracks. Really disappointing. Thx for your report.
 

Trail Conditions

Current Conditions

powered by Trailforks.com
Back
Top Bottom