TeamMuddySprocket
Well-Known Member
That's why they make bikes with suspensions 😀
We would have to ask for permission to do re-routes
Or we could use the killer tiller to recover the trail tread
Mick-
Just need some cleanup. With the missing link at one end and the flooding from south post rd it doesn't see as much traffic and is just not as cleaned up as we've made the redst of the park... From my poor memory..
There was a tree down, about 1/3 through from conover (L or M perhaps).. And the first bridge from the east(p7) (the missing bridg?) has a 3 foot gap thanks to the a$$hat that keeps removing planks. I have been working on some ideas to make it tamper proof, I'll bring by some sketches to the next TM.
-George
Last edited: