moray42
Merman
BumpThe first scheduled trail work day of 2016 is this Saturday 3/12/16.
The current plan is to ride the inner trails w/ saws, clippers, axe. Riding, stopping, riding, fixing this winters storm damage. Removing the blowdowns and clipping back the face slappers. Bring your bike, helmet, hydration, sense of humor, and meet in the Batsto parking lot at 9:00. We'll be back before 12:30. All are invited. Thanks!
Last edited: