Moving right along, albeit slowly (thanks Shimano). Got the derailleur and shifters squared away. I was hoping to have it all done last night, but Shimano went ahead and changed the pass-thru bolt for the brake lines (it's now a flanged M9). It was driving me crazy (and worrying me) why the original bolt was seemingly bottoming out. You'd think they would include this with the purchase of new shifters, but no. But at least they included new, readily available ferrules!!!
Went ahead and ordered a Wolf Tooth 42 for the crank (it's 110BCD 11s, but it should fit), because why not.
Camelbak came out with new 15oz bottles, so now I can add a small bottle to the seat tube mount. Love the look of them against the new-ish Lezyne cages. Overall it's coming along nicely.
View attachment 257619