I meet with some of the trails committee a last week to discuss some projects/issues for this year. Paul/High Tech offered a crew/equipment/material to knock some items off the punch list before their season kicks in. We tackled 2 leftover items from Ida. We re-stoned both sides of the Newmans bridge that had washed away. About 18 tons of stone. Thankfully they brought mechanized equipment, otherwise I might have quit. Then we headed over to lower blue to repair the double bridge that was displaced. We moved 1 bridge upstream and cut in new connectors. It should hold up till the next Big storm.
Thank you Paul for the continued, above and beyond, support and Larry B for lending a hand.